Give each team the same brief
Specify the same output for every bidder. A two-minute factory film, three vertical edits and Turkish subtitles should appear as separate items if you need all three. A quote for the main film alone covers different work. Compare the number of shoot days and the delivery formats alongside each line item.
Ask how changes are handled
Ask what happens if filming runs over, whether a script change is treated differently from an edit revision, and how a new language version is scoped. Try a concrete example. If English subtitles are added after filming, who translates, times and delivers them? The answer tells you which expenses are still open.
Compare schedules as well as cost
Put first cut, feedback and final delivery dates in the same table. If the film must be ready before an event, the reviewer's availability matters as much as the filming date. Ask what the team needs after approval. Their answer reveals whether the project depends on access, a script, brand assets or another input.
A sample comparison row
One quote may bundle the second shoot day while another prices it separately. Use rows such as two location days, one 90-second master and three vertical edits. Highlight empty cells for schedule, reviews and files, and confirm those items with both teams before making a decision.