All production guides

Product, place and retail content

How to prioritise a shoot across several branches

Plan branch coverage around access, light, travel, readiness and launch dates rather than postcode alone.

Identify the most urgent location

Nearby branches may have different launch deadlines. List each address with availability, access owner and delivery priority. If the required people or product will not be ready, choose a different slot rather than creating an idle stop in the route.

Allow for travel and resets

Gear needs to be set up again after each move. Empty interior coverage may dictate the schedule before a branch opens. A short exterior or greeting sequence may fit a smaller slot. Ask each manager about parking, unloading and who can admit the team.

Separate shared scenes from local coverage

One approved product demonstration can serve multiple sites where it is genuinely the same. Signs, staff and branch atmosphere need local footage. Share schedule changes with headquarters and the affected branch. Label deliveries by address and date so editors can find the right material.

An example branch priority

If prep happens at one branch in the morning and another location is busiest at lunch, record both access windows and the travel time between them. Choose an alternate exterior or approved existing photograph for the second location if access changes that day.

Let’s define your production.

Share the purpose, location, dates and delivery needs. We will agree the scope before production.

Prepare a project brief →
Call usWhatsApp ↗Project brief →